Forums Search/Statistics.
Track Forum20/11 14:58
Brainstorming for 2nd Phase Track Modernisation25/09 13:02
Rly Bridge Forum23/11 12:56
General Forum20/11 10:42
Works Forum19/11 06:33
Track Machine Forum19/11 12:46
ROB/RUB/LXING Forum18/10 11:47
Track Procurement Forum29/10 14:24
 How to use RSS

You are not logged in as a member.
Please Login as Member and then access this page

Codes & Manuals

This page is for the IRICEN Members only. If you are a member, please login and then access the page. For railway persons, the membership is free. To become member, click here.
The Members' area on IRICEN webite has:

  1. IRICEN Books
  2. Railway Board Circulars
  3. IRICEN Films
  4. Training Modules
  5. Codes and manuals
  6. IRICEN e-learning
  7. Software for railway civil Engineers and
  8. Technical literature brought out by RDSO, IRICEN and Railway Board instructions and Lots More...
Application for Allotment of Permanent Retirement Account Number (PRAN)

Copies of these books can be obtained against cash payment from the Librarian of IRICEN. Demand Draft drawn in favour of "Sr. Divisional Finance Manager, Central Railway, Pune" can be accepted in person or by post. If DD is sent in advance, adding suitable postal charges, the books will be mailed.

Concrete Technology
Author: Ghansham Bansal

Publisher : IRICEN

Price : Rs.50/-


River Training and Protection Works for Railway ridges
Author: Ajay Goyal

Publisher : IRICEN

Price : Rs.50/-


Fundamentals of Building Orientation and Layout Planning
Author: N.C. Sharda

Publisher : IRICEN

Price : Rs.50/-


Rail Steel
Author: Atul Agarwal
Abhai Kumar Rai 

Publisher : IRICEN

Price : Rs.25/-


The Investigation of Derailments
Author: R.K. Yadav

Publisher : IRICEN

Price : Rs.80/-


GnvO OFXttgttuMt
Author: Ghansham Bansal

Publisher : IRICEN

Price : Rs.50/-


Inspection and Maintenance of Steel Girders
Author: R.K. Yadav

Publisher : IRICEN

Price : Rs.50/-


Handbook of Material Testing
Author: R.K. VERMA

Publisher : IRICEN

Price : Rs.50/-


Welding Techniques
Author: A.K.RAI & PRAVEEN KUMAR

Publisher : IRICEN

Price : Rs.50/-


Bridge Bearings
Author: G. BANSAL

Publisher : IRICEN

Price : Rs.50/-


Bridge Inspection and Maintenance
Author: A.K.YADAV

Publisher : IRICEN

Price : Rs.50/-


Layout Calculations Software with this book
Author: Praveen Kumar and A.K. Rai

Publisher : IRICEN

Price : Rs.120/-


Long Welded Rails
Author: Ajit Pandit

Publisher : IRICEN

Price : Rs.50/-


Non-Destructive Testing of Bridges
Author: Abhay Kumar Gupta

Publisher : IRICEN

Price : Rs.60/-


Underwater Inspection of Bridges
Author: A.K. Yadav

Publisher : IRICEN

Price : Rs.60/-


Water Supply for Railway Engineers
Author: A.K. Rai

Publisher : IRICEN

Price : Rs.25/-

Other Books :  
Improving Running on Curves 10=00
Thiruvalluviar 5=00
Man on the job-care of Rail joints 5=00
Improving running on points and crossings 10=00
Quality Control in Track Linking 10=00
Speed on Curves 10=00
Aluminothrmic Welding 10=00
^Top
Copies of these films can be obtained against cash payment from the Librarian of IRICEN. Demand Draft drawn in favour of "Sr. Divisional Finance Manager, Central Railway, Pune" can be accepted in person or by post. If DD is sent in advance, adding suitable postal charges, the films will be mailed.

 

Title

Duration

Price (Rs.)

Working of Ballast Cleaning Machine

20 mins.

50=00

Water Proofing of an existing building

18.59 mins.

50=00

H$b|S>a h{_Q>Z JS>a Ho$ Cn`moJ go nwbm| H$m nwZ:WmnZ
Restoration of Bridge Using Callender Hamilton Girders

25:48 mins.

100=00

Points & Crossing Tamping Machine (UNIMAT)

22:33 mins.

100=00

T-28 : Points & Crossings Changing Machine

18:35 mins.

50=00

Plasser Quick Relaying System (PQRS)

14:42 mins.

50=00

Track Relaying Train (TRT)

15:19 mins.

50=00

ItIt Oglt Gt YtufKtet

18:27 mins.

50=00

Points & Crossings Part I &II

43.00 mins.

100=00

Glued Insulated Joints

42.00 mins.

100=00

Care of Rail Joints Part I & II

44.00 mins.

100=00

Inspection and Maintenance of Level Crossings Part I, II & III

62.47 mins.

100=00

Inspection of curves

15:44 mins.

50=00

Maintenance of Concrete Sleeper Track (Role of Gangmen)

34.23 mins.

100=00

Handling and Care of 90 UTS Rails

32:49 mins.

100=00

 

 

 

 

 

 

^Top  




The Codes and Manuals are prepared and uploaded by IRICEN for the information of the members only. While due care has been taken in preparing the manuals/ correction slips, IRICEN does not take any responsibility for any loss/ damage caused due to any error left inadvertently while preparing/ uploading the manuals. For authentic references, kindly refer the manuals/ correction slips issued by Railway Board.
Indian Railways Permanent Way Manual

Second Reprint 2004 embodying all advance correction slips upto
number 93 dated 05-03-04



Hindi Version English Version

Internet version embodying all advance correction slips upto number
100 dated 21-06-2006

Correction Slip no.101
Correction Slip no.102
Correction Slip no.103
Correction Slip no.104
Correction Slip no.105
Correction Slip no.106
Correction Slip no.107
Correction Slip no.108
Correction Slip no.109
Correction Slip no.110
Correction Slip no.111
Correction Slip no. 112
Correction Slip no. 113
Correction Slip no. 114

 

Manual on Long Welded Rails Second Reprint 2005

embodying all advance correction slips uptonumber 8 dated 14-01-02
Bilingual Version


Internet Version embodying all advance correction slips upto number 9 dated 18-01-06

Correction Slip no.10
Correction Slip no.11
Bridge Manual Indian Railway Bridge Manual 1998
 
English Version

Internet version embodying all advance correction slips upto number 11 dt.14.01.2003
Correction Slip no.12
Correction Slip no.13
Correction Slip no.14
Correction Slip no.15
Correction Slip no.16
Correction Slip no.17
Indian Railways Works Manual Works Manual - 2000

English Version

Internet version embodying all advance correction slips upto number 10 dt.17.02.2005

Guidelines for Earthwork in Railway Projects
RDSO, Lucknow
Guidelines for Earthwork in Railway Projects English Version  
Bridge Rules
RDSO, Lucknow
Bridge Rules
Incorporationg upto C/S No.33
Correction Slip no.34
Correction Slip no.35
Correction Slip no.36 & 37
Correction Slip no.38
Correction Slip no.39
Concrete Bridge Code
Incorporating upto C/S No.7
Correction Slip no.8
Correction Slip no.9
Correction Slip no.10
Correction Slip no.11
Bridge Sub-structure & Foundation Code
RDSO, Lucknow

Bridge Sub-structure & Foundation Code Incorporating upto C/S No.22
Correction Slip no.23
Correction Slip no.24
Correction Slip no.25 & 26
Correction Slip no.27
GENERAL CONDITIONS OF CONTRACT
Incorporating Correction Slip No. 1 to 5 and amendments issued vide Bd's letter No.2003/CE-I/CT/4/Pt-I dt.12-05-06, 07-12-06, 23-05-07 and 23-01-2008 and letter No.2007/CE.1/CT/18 dt. 28-09-2007 and 07-03-2008

 
MANUAL FOR ULTRASONIC TESTING OF RAILS AND WELDS
RDSO, Lucknow
Revised 2006

English Version
Correction Slip no.1
Correction Slip no.2
Correction Slip no.3

^Top
Software for Railway Civil Engineers

S.No.

Name of Program

1

New program on Realignment of curves (Revised & Updated on 04th Sep.'08)

2 New Software for Layout calculation  Developed by Shri M S Ekbote Retd AMCE
3 New Software for Curves Calculation 15.02.08 Developed by Shri M S Ekbote Retd AMCE
4

-New program on Gang Strength Calculation (rel.31-03-08) based on MCNTM report

- Program in MS-Excel format (Gang Strength calculation based on MCNTM)

5

Mix Design

6 Program for calculation of earthwork developed by Shri K. Ravindra Babu

7

Track Geometry Index Analyser

8

Speed on Curves

9

Track Diagram

10

Track Surfacing


^Top




curves

Understanding Curves

Multimedia Presentation on Surveying & Mapping

future trends

Future Trends in design & construction of Bridges

increase in axle load


Increase in Axle Load of Freight Wagons

Pre-stressed Concrete

Pre-Stressed Concrete

Bridge Bearings


Bridge Bearings


Concrete Processes


Concrete Processes

Concrete Materials

Concrete Materials

Pile Foundation

Pile Foundation

Well Foundation

Well Foundation

Geotechnical Investigation

Geotechnical Investigation

Clearance of Rolling Stock on Railway Bridges

Clearance of Rolling Stock on Railway Bridges

Land Management

Land Management

high speed corridors


Introduction of high speed corridors on IR-impact & challenges before us


^Top


Film on Construction of Panvel Viaduct and Karbude Tunnel on KRCL  
Pilot Project on Bridges   Non-Destructive Testing Manual

Under-water Inspection Manual

Acoustic Emissions technique

Mapping of unknown foundations

Residual fatigue life of bridges

Instrumentation of bridges

Bridge Evaluation Report

Analysis of Masonry Arch Bridges /
Modified MEXE Method

Civil Engineering Report No.C-64

Instructions from RDSO   MANUAL FOR FLASH BUTT WELDING OF RAILS 1996-CORRECTION SLIP.

GUIDELINES FOR HANDLING OF RAILS

RAIL STRESS CALCULATION METHODOLOGY
Program for calculation

CONVERSION OF PAMBAN BRIDGE FROM MG TO BG
SAMPLE CALCULATIONS OF CHECKING EXISTING ABUTMENTS FOR NEW/ HIGHER LOADS
HEAVY MACHINES DRAWINGS SPECIFICATIONS & SCHEDULES
(Please ensure that Pop-ups are enabled in the browser)
Author: Track Directorate,

RDSO, Lucknow

Price : Free Distribution

INDIAN RAILWAY STANDARD SPECIFICATIONS & MANUALS

(Please ensure that Pop-ups are enabled in the browser)

 

Author: Track Directorate,

RDSO, Lucknow

Price : Free Distribution

RDSO Drawings on Track RDSO Drawings on Track collected from RDSO and converted into PDF format
RDSO Drawings on Bridges RDSO Drawings on Bridges collected from RDSO and converted into PDF format
E-Documentation of Track related issues (Please ensure that Pop-ups are enabled in the browser)

 

Author: Track Directorate,

RDSO, Lucknow

Price : Free Distribution

E-Documentation of Bridge related issues (Please ensure that Pop-ups are enabled in the browser)

 

Author: B&S Directorate,

RDSO, Lucknow
Price : Free Distribution


^Top
USFD Manual
Small Track Machine Manual
Works Manual

Manual for Ultrasonic Testing of Rails and Welds

Indian Railways Small Track Machine Manual

Indian Railways Works Manual

Bridge Manual
Long Welded Manual
IRPWM

Indian Railways Bridge Manual

Manual of Instructions on Long Welded Rails

Indian Railways Permanent Way Manual

^Top

Latest circulars from Rly. Board

Correction Slip No. 3 to the "Specification for Track Ballast", IRS-GE-1, June 2004

WORKING INSTRUCTIONS FOR TEMPORARILY ENGINEERING MANNED LEVEL CROSSING GATES DURING FOG, NON-INTERLOCKED, NOT PROVIDED WITH TELEPHONE WITH NORMAL POSITION CLOSED TO ROAD TRAFFIC.

PUBLICATION OF GAZETTE NOTIFICATION AMENDING INDIAN RAILWAYS

WORKS CONTRACT PROCEDURES- AMENDMENT THEREOF

COMMITTEE FOR REVIEW FOR THE TRACK MACHINE MANUAL-2000.

INSTRUCTIONS FOR CANDIDATES APPEARING IN WRITTEN EXAMINATION OF 70% SELECTION/ 30% LDCE FOR PROMOTION FROM GROUP 'C' TO GROUP 'B' POSTS.

NIGHT PATROLLING ALLOWANCE-RECOMMENDATION OF WITH CPC-REVISION OF RATES.

CONFIRMATION IN TENDER FILE REGARDING THE UPLOADING OF NIT AND TENDER DOCUMENTS ON THE WEBSITE.

AMENDMENT TO SPECIFICATION FOR RAILS- IRS-T-12-96.

WITHDRAWAL OF EXEMPTION FROM PAYMENT OF SECURITY DEPOSIT(SD) IN SUPPLY CONTRACTS FOR PROCUREMENT OF SAFETY ITEMS, IN CASE OF SSI UNITS REGISTERED WITH NSIC

REVIEW OF WORKING INSTRUCTIONS OF MANNED LEVEL CROSSING GATES

DFC LOADING (32.5T AXLE LOAD) AND DESIGN CRITERIA

GAZETTE NOTIFICATION NO. F-24-1-2007-TS-III DATED 6-11-2007 REGARDING RECOGNITION TO ASSOCIATE MEMBERSHIP AND TECHNICAL MEMBERSHIP EXAMINATION

PARTICIPATION OF JOINT VENTURE FIRMS IN WORKS TENDERS

DRAWING FOR STANDARD SPAN TO BE ISSUED BY RDSO CAPITAL FOR 25T LOADING-2008 AND DFC LOADING (32.5T AXLE LOAD).

MOBILE BRIDGE INSPECTION UNITS (MBIUS) - CREATION OF POST FOR OPERATION AND MAINTENANCE.

REVIEW OF WORKING INSTRUCTIONS OF MANUAL LEVEL CROSSING GATES.

REPLACEMENT OF HM LOADING PROVIDED IN IRS BRIDGE RULES BY DFC LOADING (32.5T AXLE LOAD)

IMPLEMENTATION OF - THE BUILDING AND OTHER CONSTRUCTION WORKERS (RECS) ACT, 1996 AND THE BUILDING AND OTHER CONSTRUCTION WORKERS WELFARE CESS ACT, 1996 IN RAILWAYS CONTRACTS

CORRECTION SLIP TO PARA NO 1264 OF INDIAN RAILWAY CODE FOR ENGINEERING DEPARTMENT - (THIRD REPRINT) - 1999

EMPOWERMENT OF FEILD ORGANIZATIONS (WORKS CONTRACT MATTERS)

A&C SLIP NO.10 OF JANUARY 2008 TO INDIAN RAILWAY STANDARDS SPECIFICATION FOR FUSION WELDING OF RAILS BY ALUMINO THERMIC PROCESS.

ELIMINATION OF LEVEL CROSSINGS BY CONSTRUCTION OF "LIMITED USE SUBWAYS"

TRANSPARENCY IN PURCHASE CONTRACTS AWARDED ON NOMINATION BASIS

TENDERING PROCESS-NEGOTIATION WITH L1 - PRE-DECIDED SPLIT ORDERING

PERFORMANCE GUARANTCE-FORMS OF SUBMISSION

IRREGULARITIES IN CONTRACT AGREEMENTS

CLARIFICATION REGARDING FUSION WELDING OF RAILS BY THE ALUMINOTHERMIC PROCESS

EDUCATIANAL QUALIFICATION FOR RECRUITMENT TO GROUP C POSTS IN CIVIL ENGINEERING DEPARTMENT ON THE RAILWAYS

TRACK STRUCTURE TO BE PROVIDED WHILE EXECUTING TRACK RENEWALS,GAUGE CONVERSION,NEWLINES AND DOUBLING WORKS

AMENDMENT TO GENERAL CONDITIONS OF CONTRACT-(WORKS CONTRACTS).

CORRECTION TO POWERS OF GENERAL MANAGERS

IRS T-29-200 FOR CAST MANGANESE STEEL CROSSINGS.

ADDENDUM AND CORRIGENDUM SLIP NO.-2 TO SPECIFICATION FOR FABRICATION AND ERECTION OF STEEL GIRDER BRIDGE AND LOCOMOTIVE TURN-TABLES (FABRICATION SPECIFICATION)SERIAL NO.B1-2001.

Provision of Engineering Time Allowance

AMENDMENT IN PARA (a) OF 2321 OF INDIAN RAILWAY STORES CODE REGARDING EARNEST MONEY DEPOSIT (EMD) AND SECURITY DEPOSIT (SD) IN CASE OF SALE TENDER

CONSTITUTION OF TENDER COMMITTEE AND AUTHORITY COMPETENT TO ACCEPT STORES PURCHASE

REBUILDING/ STRENGTHENING/ REHABILITATION OF BRIDGES ON INDIAN RAILWAYS

INCREASE IN AXLE LOAD OF FREIGHT WAGONS

PROCEDURE FOR FINALIZING RISK AND COST TENDERS

ELECTRIFIEATION OF SIDINGS-ISSUE OF CORRECTION SLIP TO ENGINEERING CODE PARA 1826

POWER OF ACCEPTANCE OF WORKS TENDERS

EMPOWERMENT OF FIELD ORGANIZATIONS (WORKS CONTRACT MATTERS).

dtmtqtbtâWtGòtê Gòtç jtuÆòettê Gòt qtTettettçMtXt

DELEGATION OF POWERS TO GENERAL MANAGERS-REVISION OF ANNEXURE-II TO CHAPTER V, INDIAN RAILWAYS FINANCIAL CODE,VOL.I. (ENGLISH)

ADDENDUM & CORRIGENDUM SLIP NO.3 & ERRATA TO THE INDIAN RAILWAYS SCHEDULE OF DIMENSION (BG) REVISED.2004

PACKAGE OF ALLOWANCE ISSUE OF WRIST WATCH TO KEYMEN,MATE & PWM.

TRACK STRUCTURE TO BE PROVIDED WHILE EXECUTING TRACK RENEWALS GAUGE CONVERSION,NEW LINES AND DOUBLING WORKS

RETRO REFLECTIVE TYPE OF ENGINEERING INDICATORS

ENHANCEMENT OF TENDER VALUE - DELEGATION OF POWERS OF NS ITEMS

UNIVERSALISATION OF CC+6+2T LOADED WAGONS RUNNING.

BRIDGE ORGANISATIONS ON ZONAL RAILWAYS

UNIVERSALISATION OF CC+6+2T LOADED WAGONS RUNNING

INCREASE IN AXLE LOADS OF FREIGHT WAGONS

FORMATION TREATMENT

BALLAST PROCUREMENT AND ITS UTILISATION.

ENERGY CONSERVATION AND REDUCTION OF CARBON EMISSION.

CORRECTION SLIP (ACS No.41) TO PARA 1240 A OF ''INDIAN RAILWAYS CODE FOR THE ENGINEERING DEPT" DEPARTMENT-1999 (THIRD RE-PRINT).

AMENDMENT TO GENERAL CONDITIONS OF CONTRACT (WORKS CONTRACT).

REVISION OF POLICY CIRCULAR NO.6 PARA 6 AND APPENDIX 1 & 2.

EXECUTION OF TRACK WORKS THROUGH CONTRACTS

INTRODUCTION OF THE CATEGORY OF SENIOR PERMANENT WAY SUPERVISOR

UNDERWATER INSPECTION OF BRIDGES - SYSTEM IMPROVEMENT SUGGESTED BY CBI

INCREASE IN AXLE LOAD OF FREIGHT WAGONS

RECRUITMENT OF GROUP 'D' STAFF ON INDIAN RAILWAYS

REVISED CODAL LIFE OF ASSETS.

PROPOSED BROAD GAUGE BRIDGE FOR LUNI RIVER IN CONNECTION WITH GAUGE CONVERSION OF SAMDARI-BHILDI PROJECT.

INCREASE OF SPEED ON TURNOUTS

Technical Instructions issued by Member Engg., Rly. Board

Erection of dish antennae and cable network for direct to home (DTH) services in railway colonies

AMENDMENT TO GENERAL CONDITIONS OF CONTRACT (WORKS CONTRACT)

SAFETY IN DISMANTLING OF BRIDGES & STRUCTURES

CLARIFICATION REGARDING MINIMUM TECHNICAL ELIGIBILITY CRITERION IN WORKS TENDERS

ELIMINATION OF LEVEL CROSSINGS BY CONSTRUCTION OF ‘LIMITED USE SUBWAYS’

ENGAGEMENT OF PROJECT MANAGEMENT CONSULTANTS ( PMCs )

MINIMUM ELIGIBILITY CRITERIA IN WORKS TENDERS

RAILWAY BOARD LIFTS RESTRICTION ON SALE OF SCRAP RAILS

REPORT OF THE COMMITTEE ON MANPOWER AND COST NORMS FOR TRACK MAINTENANCE

SUBMISSION OF INCOME TAX CLEARANCE CERTIFICATE (ITCC) BY CONTRACTORS/TENDERERS

^Top